Envitech was appointed by Arabian Environmental Construction (AEC) to carry out third party, independent, Construction Quality Assurance (CQA) during the installation of the geosynthetic lining system at Ghabawi non-hazardous landfill site, Cell No. 5. The area that was lined with a single composite lining system was approximately 190 000m2. The lining system included a Geosynthetic Clay Liner (GCL), a 2mm HDPE (smooth and textured), a 1000g/m2 protection geotextile and a geocomposite drainage layer.

Envitech was responsible for carrying out the construction quality assurance during the duration of the geosynthetic lining installation. The key features of the project included the following:

  • Subgrade inspection and approvals
  • Anchor trench inspection and approvals
  • Daily record keeping (Daily diaries, subgrade acceptance reports, panel layout diagrams, etc.)
  • On site destructive and non-destructive quality testing
  • Conformance testing
  • Technical assistance and advice
  • Welding Equipment inspections
  • Material delivery inspections
  • Verification and quality testing of repairs
  • Preparation of as-built drawings for the geosynthetic panels
  • Electronic Leak Location Testing on the covered geomembrane
  • Final CQA Report and handover

 

Electronic Leak Location Testing

HDPE Samples for Conformance Testing

PROJECT HIGHLIGHTS


3rd party CQA Electrical Leak Location Testing